FEASIBILITY STUDY

Southern Muğla Solid Waste Management, Turkey.

Project Description:

With finance provided by KfW of Germany, the IGIP (Germany), TEMPO and ARCADIS (Germany) team was responsible for conducting a Feasibility Study to determine the most economical and technically feasible method of solid waste removal for the southern Muğla area.

A comprehensive feasibility study covering socio-economic as well as topographic and geological factors was conducted. Based on the findings of the study, a Master Plan will be prepared for the implementation of a sanitary landfill area.

Client:

 Municipality of Muğla

Project Population:

 150,000

Status:

 Completed

City of Bilecik, Feasibility Study for Resources Development in the Karasu Basin, Turkey

Project Description:

A Feasibility Study was carried out in order to determine the optimum water use potential of the Karasu River Basin. The study included the following:

  • Estimating the potable water demand for the city of Bilecik and the towns of Söğüt, Osmaneli, Çaltı, Pazaryeri and Bayırköy.
  • Estimating the water demand for irrigation purposes.
  • Estimating the water demand for power generation.

Upon completion of the feasibility study, water supply systems and a main water transmission line were designed.

Client:

 The Bank of Provinces

Project Population:

 100,000

Status:

 Completed