CONSTRUCTION MANAGEMENT & SUPERVISION |
Eryaman
(Ankara) Housing Development (Phase V), Turkey |
|
Project Description:
TEMPO has provided construction supervision and consulting services for one of Turkey's largest urban development projects.
The project area was divided into seven regions, with a contractor assigned to each region. Over an area of 69 ha 3,444 residential units were built. The project was completed over four years.
|
Client: |
Prime
Ministry Housing Development Administration |
Project Area: |
69
ha, 3444 residence units |
Status: |
Completed
|
|
|
City
of Ankara ASKİ Wastewater & Stormwater Collection Improvements,
Ankara, Turkey
|
|
Project Description:
This project was one of the largest infrastructure investments carried out in Ankara, the capital of Turkey. The World Bank financed the project. The main objective was to rehabilitate the existing wastewater and stormwater collection networks serving the city. Problem areas were determined during a preliminary study and TEMPO's qualified and experienced personnel provided construction supervision and consulting engineering services throughout the project.
The diameter of the lines varied between 300 mm and 2,000 mm. All data produced on site was collected and recorded. The rehabilitation work was tested and checked, and detailed documentation was submitted to the client.
|
Client: |
ASKİ,
Ankara Water and Wastewater Authority. |
Project
Population: |
2,650,000 |
Status: |
Completed |
|
| |