Natural Gas References
Bahcesehir (Istanbul) Natural Gas Supply Project
 |
| Year |
: |
1993-1995 |
| Location |
: |
Istanbul, Turkey |
| Client |
: |
Emlak Bank (BOTAŞ) |
| Partnership |
: |
- |
|
Main Project Features :
In the content of the Project, the natural gas main line and distribution network were designed for the Bahçeşehir Housing Development Area in İstanbul. The project was to serve a 470-ha housing development of 16,000 people. The gas line was designed to bring natural gas from İstanbul West RMS Type A at 19 bar pressure, transmitting to Type B RMS constructed in Bahçeşehir, where the pressure was reduced to 4 bar. The capacity is 34,000 scmh.
The main gas line was composed of 16" and 8" steel pipes over a length of 5 km at 19 bar pressure; with the entire network including polyethylene and steel pipes.
Type of Services Provided :
- Data collection and evaluation
- Geotechnical investigations
- Design of the natural gas main line and distribution network
- Implementation design for cathodic protection
- Testing of the internal installations of the buildings
- Preparation of tender documents
- Technical assistant to the client
- Supervision services
Esenyurt (Istanbul) Cogeneration Plant Natural Gas Supply Project
 |
| Year |
: |
1994-1995 |
| Location |
: |
Istanbul, Turkey |
| Client |
: |
Doğa Energy Ltd. (BOTAŞ) |
| Partnership |
: |
- |
|
Main Project Features :
TEMPO provided a both design and supervision for a 10" steel natural gas transmission line (70 bar) connecting a main (36" natural gas line coming from Russia) to a co-generation plant located in Esenyurt, İstanbul, including A and B type RMS Buildings. The capacity is 110,000 schm. The project design necessitated the crossing of the Trans-European Motorway (TEM), achieved by means of horizontal drilling.
Type of Services Provided :
- Data collection and evaluation.
- Geotechnical investigations
- Design of the natural gas main line and distribution network.
- Preparation of tender documents.
- Assistance in contract awarding.
- Supervision services.
Izmir Ataturk Organised Industrial Zone Natural Gas Project
 |
| Year |
: |
2003-2005 |
| Location |
: |
Izmir, Turkey |
| Client |
: |
İzmir Atatürk OIZ Adm.,Ataç Construction Inc. |
| Partnership |
: |
- |
|
Main Project Features :
In the content of the Project, the natural gas main line and distribution system were designed for Izmir Atatürk Organized Industrial Zone. The system components were as the following:
- 1 no. of A type, RMS Station (48/19 bar, 75,000 m3/h capacity)
- 11 no.’s of B type regional regulating station (19/4 bar, 115,000 m3/h capacity)
- Transmission line (Length: 10,469 m, 19 bar, steel pipes with misc. diameters)
- Distribution network (35,274 m, PE pipes, 4 bar with misc. diameters)
Type of Services Provided :
- Data collection and evaluation
- Detailed Design of the natural gas main line and distribution network
- Preparation of as-built projects
Kayseri Natural Gas Project Feasibility Studies
 |
| Year |
: |
2003-2005 |
| Location |
: |
Kayseri, Turkey |
| Client |
: |
EPDK, MAPA Construction Inc. |
| Partnership |
: |
- |
|
Main Project Features :
In the content of the Project, consultancy, investigations and feasibility services have been given to EPDK (energy market regulatory authority) for Kayseri Natural Gas Tender.
Type of Services Provided :
- Data collection and evaluation
- Population Projections and estimation of consumption rates
- Preliminary design of the natural gas distribution network
- Cost estimation for different alternatives
Gebze Organised Industrial Zone Expansion Area Infrastructure Project
 |
| Year |
: |
1996-2005 |
| Location |
: |
Gebze, Turkey |
| Client |
: |
GOSB Administration |
| Partnership |
: |
- |
|
Main Project Features :
Our Company has given engineering and consultancy services for infrastructural project for 250 ha expansion area of GOSB (Gebze Organised Industrial Zone) which is one of the biggest and modernist industrial zones in Turkey. The infrastructure project includes the following:
- Road projects
- Water supply projects
- Wastewater and stormwater collection projects
- Natural gas distribution projects
- Electric and telecommunication projects
Type of Services Provided :
- Collection of the basic data
- Topographical and geotechnical investigations
- Preparation of implementation projects
- Preparation of BoQ’s
- Preparation of construction tender documents
- Construction supervision
Design Services for Antalya Organised Industrial Zone 1st and 2nd Expansion Areas Infrastructure Project
 |
| Year |
: |
2006-2009 |
| Location |
: |
Antalya, Turkey |
| Client |
: |
Antalya OIZ Administration |
| Partnership |
: |
- |
|
Main Project Features :
Project components are:
- Waste water network: 10 km
- Wastewater transmission line: 2.7 km
- Roads: 16 km
- Potable water network: 16km
- Storm water network: 12 km
- Electricity network: 16 km
- Natural gas network: 20 km
- Communication Network: 12 km
Type of Services Provided :
- Data collection and evaluation
- Geotechnical investigations
- Final design
- Preparation of BoQ
Nazilli Organised Industrial Zone Infrastructure Project
 |
| Year |
: |
2008 |
| Location |
: |
Nazilli, Turkey |
| Client |
: |
Nazilli OIZ Administration |
| Partnership |
: |
- |
|
Main Project Features :
Nazilli Organised Industrial Zone is planned for an area of 130 ha. All infrastructural designs are prepared in preliminary and then detailed implementation basis including the following:
- Potable water network: 6 km
- Water transmission line: 6 km
- Irrigation network: 6 km
- Natural gas distribution network: 7 km
- Wastewater network: 3,5 km
- Stormwater network: 5 km
- Roads: 6 km
- Energy transmission line: 64 km
- Communication line: 16 km
Type of Services Provided :
- Data collection and evaluation
- Preliminary design
- Final design
- Preparation of BoQ’s
- Preparation of construction tender documents
Design and Supervision Services for Gebze V (Chemicals) Organised Industrial Zone Infrastructure Project
 |
| Year |
: |
2004-2006 (design) 2006-2009 (supervision) |
| Location |
: |
Kocaeli, Turkey |
| Client |
: |
Gebze V Chemicals OIZ Administration |
| Partnership |
: |
|
|
Main Project Features :
The project zone covered an area of 240 ha. Project components are:
- Waste water treatment plant
- Waste water network
- Roads
- Potable water network
- Storm water network
- Electricity network
- Natural gas network
- Communication Network
- Electric SCADA Network
Type of Services Provided :
- Data collection and evaluation
- Geotechnical investigations
- Conceptual design of water supply, wastewater systems and WWTP
- Final design
- Preparation of BoQ and tender documents
- Supervision of construction works
Engineering Works and Project Services for Erez Industrial Area (Palestine)
 |
| Year |
: |
2006-2006 |
| Location |
: |
Erez, Palestine |
| Client |
: |
Union of Chambers and Commodity Exchanges of Turkey |
| Partnership |
: |
- |
|
Main Project Features :
The area covers 67 ha, of which 47 ha belong to the present area, and 20 ha belong to the expansion area. Each kind of infrastructure in the area has fallen into disuse and is redesigned. Moreover, the parcel planning in the area will be done and fabrics that will make productions in several industrial branches will be established according to this planning.
Design of the following infrastructure is done:
- Road projects
- Water supply project
- Wastewater and stormwater network project
- Wastewater treatment plant
- Fire water project
- Natural gas distribution project
- Electricity and telecommunication network
- Solid waste collection and disposal systems
Type of Services Provided :
- Collection of the basic data and evaluation of existing projects and literature
- Topographical and geotechnical investigations
- Hydrogeological investigations
- Preparation of implementation projects
- Preparation of BoQ’s
- Preparation of construction tender documents
Design Services For Gebze IV Machinery Organised Industrial Zone Infrastructure Project
 |
| Year |
: |
2004-2006 |
| Location |
: |
Kocaeli, Turkey |
| Client |
: |
Gebze IV Machinery OIZ Administration |
| Partnership |
: |
- |
|
Main Project Features :
The project zone covered an area of appr. 509 ha and was constituted of two planning phases. Project components are:
- Waste water treatment plant: Average flowrate of 700 m³/h
- Waste water network: totally 20,677 m
- Roads: totally 30,812 m
- Potable water network: totally 23,794 m, (water reservoir 10,000m3 & 2 pumping stations)
- Storm water network: totally 21,340 m
- Electricity network
- Natural gas network: totally 29,782 m network (4 bar distribution network and 19 bar transmission network, 10 A and B type RMS)
- Electric SCADA Network
- Fire protection water network: totally 26,199 m
- Irrigation water network
- Stream rehabilitation: 9 open channels & rehabilitation cross-sections
Type of Services Provided :
- Data collection and evaluation
- Geotechnical investigations
- Conceptual design
- Final detailed design
- Preparation of BoQ and tender documents.
TED Ankara Colleague Campus Area Project Infrastructural Works
 |
| Year |
: |
1999-2001 |
| Location |
: |
Ankara, Turkey |
| Client |
: |
TED Ankara Colleague Uygur Architecture |
| Partnership |
: |
- |
|
Main Project Features :
All infrastructural designs for inside and outside of TED Ankara Colleague campus area which has 6,000 student capacity is prepared. In the content of the Project detailed design of the following have been carried out:
- Water supply project
- Wastewater and stormwater collection networks
- Natural gas distribution network
- Electric and telecommunication network
Type of Services Provided :
- Collection of the basic data
- Topographical and geotechnical investigations
- Preparation of implementation projects
- Preparation of BoQ’s
- Preparation of construction tender documents
TOSB (Taysad Organised Industrial Zone) Infrastructural Project Design Works
 |
| Year |
: |
1996-1998 |
| Location |
: |
Gebze, Turkey |
| Client |
: |
TOSB Administration |
| Partnership |
: |
- |
|
Main Project Features :
TOSB (TAYSAD Organised Industrial Zone) is established on 280 ha area, to give service to firms working on automotive sub-industry sector. All infrastructural design works of the organised industrial zone are done by Tempo including the following:
- Development plans and implementation
- Road projects
- Water supply projects
- Wastewater and stormwater collection projects
- Natural gas distribution projects
- Electric and telecommunication projects
Type of Services Provided :
- Collection of the basic data
- Topographical and geotechnical investigations
- Preparation of implementation projects
- Preparation of BoQ’s
- Preparation of construction tender documents
|