Water Supply References
Istanbul Metropolitan Area Water Supply System Project (Lot 4 - Lot 8)
 |
| Year |
: |
2005 – ongoing (2009) |
| Location |
: |
Istanbul, Turkey |
| Client |
: |
Istanbul Water and Sewerage Authority, ISKI |
| Partnership |
: |
CEMA Eng. |
|
Main Project Features :
In the content of the Project design and consultancy services were given for potable water plants and service units in various water basins of Istanbul.
The project components are:
- Water distribution network: 1180 km
- Water transmission line: 240 km
- 4 water reservoir (10,000 m³ each)
- 18 pumping stations
Type of Services Provided :
- Collection of the basic data and evaluation of the existing designs and literature
- Topographical and geological investigations
- Hydro geological studies
- Design of network, reservoirs, pumping stations and transmission lines
- Preparation of the BoQ’s
- Preparation of construction tender documents
Abu Shaybay And Wadi Rumman (Libya) Dam Project
 |
| Year |
: |
2006-ongoing |
| Location |
: |
Tripoli, Libya |
| Client |
: |
Metis Ltd. (Libya Water Authority) |
| Partnership |
: |
- |
|
Main Project Features :
Wadi Rumman and Wadi Abu Shaybah dam is designed and constructed to protect the irrigation areas at the downstream side. Besides the flood control, which happens periodically, Wadi Rumman and Wadi Abu Shaybah dam will provide additional water for irrigation. Another purpose of the dams is to store the water in the aquifer in case the ground condition is suitable. Some of the technical specifications of the dams are:
|
|
Wadi Abu Shaybah Dam
|
Wadi Rumman Dam
|
|
Crest Height
|
23 m
|
17,50 m
|
|
Crest Length
|
1242.67 m
|
1293 m
|
|
Fill Amount
|
1,200,000 m3
|
694,000 m3
|
|
Crest Elevation
|
299 m
|
258,50 m
|
|
Q100
|
480 m3/s
|
480 m3/s
|
|
Q1000
|
870 m3/s
|
870 m3/s
|
|
Qbottom outlet
|
50 m3/s
|
50 m3/s
|
|
Qspillway
|
400 m3/s
|
400 m3/s
|
Type of Services Provided :
-
Data collection and evaluation.
-
Geotechnical investigations
-
Detailed design of the dams and their components (such as road, derivation canal, cofferdam, spillway, bottom outlet, intake structure)
Water Supply Project for Areas Which are Included in Ankara Metropolitan Municipality Service Area
 |
| Year |
: |
2006 - 2008 |
| Location |
: |
Ankara, Turkey |
| Client |
: |
Ankara Water and Sewerage Authority, ASKI |
| Partnership |
: |
- |
|
Main Project Features :
For the areas which are included in the servicing area of Ankara Metropolitan Municipality, existing water supply systems are evaluated and design of new systems for potable water supply, storage and distribution are done.
In the content of the Project planning and design of the following construction measures have been completed:
The project has the following construction measures:
-
Potable water main pipeline: 441 km,
-
Potable water networks: 2,680 km,
-
Reservoirs: 140 (capacity between 50 and 1000m³),
-
Pumping Station Projects: 106 (different capacities, total area: 4,532 m2)
-
Package water treatment plants where required
Type of Services Provided :
-
Collection of basic data and evaluation
-
Preparation of Technical Evaluation Reports
-
Topographical surveys
-
Final detailed design of water supply system including designs of potable water supply systems, pumping stations, reservoirs, geo-technical studies, energy supply systems, water distribution systems, package treatment plants
-
Final design including hydraulic, structural, mechanical and electrical details
-
Preparation of BoQ, cost estimations and Works Tender Documents
Gumushane Water Supply System Project
 |
| Year |
: |
1993-1995 |
| Location |
: |
Gumushane, Turkey |
| Client |
: |
Iller Bank |
| Partnership |
: |
- |
|
Main Project Features :
Gümüşhane water supply project includes design of network, reservoirs and the lines between reservoirs. The domestic water demand of the city is and will be provided from the wells located near the Harşit River. The water is pumped to the water supply network from these wells by pressured pipes.
The project components are:
- Project population (2028): 80,000 PE
- Design flow (2028): 165 It/sec.
- Water Reservoirs: 9 units (500m³ each)
- Total length of the network pipes: 100 km
- Transmission (connection) line: 4350 m
Type of Services Provided :
- Collection of basic data and evaluation.
- Geological and topographical surveys.
- Final design of water supply system.
- Preparation of Bills of Quantities.
- Preparation of tender documents.
Karasu Basin Water Resource Management Feasibility Report
 |
| Year |
: |
1989-1990 |
| Location |
: |
Bilecik |
| Client |
: |
İller Bankası Genel Müdürlüğü |
| Financed by |
: |
İller Bankası Genel Müdürlüğü |
| Partnership |
: |
- |
|
Main Project Features :
Tempo Engineers and Consultants made the feasibility study on the most feasible using way of Karasu Creek, which flows south to east in borders of Bileck and joins Sakarya River at Osmaneli. Project region was named as Bilecik Group and consisted of:
-
Bilecik
-
Bozüyük
-
Pazaryeri
-
Söğüt
-
Çaltı
-
Bayırköy
-
Osmaneli
Type of Services Provided :
-
Water supply to Bilecik, Söğüt, Çaltı, Pazaryeri, Bayırköy and Osmaneli settlements,
-
Irrigation water
-
Hydroelectrical Energy Santral
-
Evaluation of above two or three alternatives in feasibility concept,
-
Feasibility study, field surveys, hydraulic calculations, preparation of BoQ for each alternative.
Water Intake Structure of Balçova Dam Project
 |
| Year |
: |
2006-2007 |
| Location |
: |
İzmir/Turkey |
| Client |
: |
İzmir Water and Sewerage General Directorate(İZSU) |
| Partnership |
: |
- |
|
Main Project Features :
The aim of the project was to supply drinking and usage water from different heads of Balçova Dam in a sustainable way. In order to achieve this, revision of the existing water intake structure or, in case of unavailability of revision, design for a new water intake structure were the alternatives.
Type of Services Provided :
-
Collection of basic data and evaluation
-
Preparation of Technical Evaluation Reports
-
Final detailed design of water intake structure
-
Preparation of BoQ, cost estimations
|